MOQ & Pricing
Real numbers instead of “contact us for price”. The minimum order quantities below are taken directly from the 51 models in our current catalogue, and the price bands are the ranges we actually quote from at MOQ quantity — so you can check whether your budget and your first order are even possible before you write to us.
Minimum order quantity by category
Computed from every product record in our catalogue, not from a sales sheet.
| Category | Models | MOQ / SKU | FOB price band |
|---|---|---|---|
| Walking aids & canes Carbon-fibre and folding canes carry a higher MOQ than fixed aluminium models because the tube set and tip tooling are shared across a full run. | 22 | 100–500 units | US$15 – US$25 |
| Bath safety & shower chairs The widest MOQ range in our catalogue: a standard moulded seat starts at 30 units, while a custom frame colour or a new seat mould moves the entry point up. | 13 | 30–500 units | US$10 – US$15 |
| Walkers & rollators A single flat MOQ of 100 units per SKU — these models share one frame platform, so there is no low-volume variant. | 6 | 100 units | US$12 – US$20 |
| Commode chairs Steel folding models start low; height-adjustable and padded models with multi-part frames need a longer setup and therefore a higher entry point. | 6 | 30–500 units | US$10 – US$15 |
| Toilet safety rails Small, high-density cartons keep freight cheap, which is why the low end of this category is more accessible than the frame products. | 4 | 50–300 units | US$10 – US$15 |
Price basis: FOB South China · per unit · standard colours · export carton · MOQ quantity, not container volume. Bands last reviewed 2026-10-25. Where your specification would push the unit price outside the published band, we say so before quoting — not after.
How minimum order quantities actually work
Four things worth knowing before you ask for a lower MOQ.
Per SKU, not per purchase order
The MOQ applies to each model and colour combination, not to the order total. Three SKUs at their individual MOQ is a valid order; one SKU below its MOQ is not.
Setup cost is the real floor
Tube cutting, welding jigs, powder-coating batch size and carton printing all have a fixed cost. A 30-unit run pays the same setup as a 300-unit run — it just pays it across fewer pieces.
Custom colour and packaging move the floor
Standard colours are coated in batches that serve several orders. A custom RAL colour or a printed carton becomes a dedicated run, so the minimum rises with it.
Mixed containers are allowed
Once each SKU clears its own minimum, you can combine categories in one container. This is how most first orders from distributors are structured.
What the quote covers
No line items appear after the deposit. If it is not on this list, it is not in the price.
- Raw material and components
- Production labour and assembly
- Powder coating / anodising in standard colours
- In-line and pre-shipment inspection
- Standard export carton with your shipping mark
- Declaration of conformity and batch test report
- Loading supervision and container photos
- Export documentation (packing list, invoice, HS code)
- Product liability insurance on the shipped value
Three ways to lower your landed cost
In practice these move the number more than negotiating the unit price.
Consolidate SKUs
Freight and setup are per run. Moving from three small orders a year to one mixed container usually cuts landed cost more than any negotiation on unit price.
Use existing tooling
Choosing a model already in production avoids the new-mould or new-jig cost entirely. Customisation on an existing platform (colour, label, carton) is far cheaper than a new frame.
Standardise packaging
A stock carton with a printed shipping mark costs a fraction of a full-colour retail box. Upgrade the retail packaging only after the product is validated in your market.
From brief to container in six steps
The same process whether you order 30 units or 30,000.
- 1
Send the brief
Product, target quantity, destination country and any certification your customer requires.
- 2
Quote within 24 hours
An itemised FOB quote — unit price, carton data, MOQ per SKU and lead time.
- 3
Sample approval
Pre-production sample against your spec, with the test report for that batch.
- 4
Order & deposit
PI issued, deposit received, production slot booked in writing.
- 5
Production & inspection
15–30 days, with loading photos and the batch inspection report before shipment.
- 6
Shipment
FOB, CIF or door delivery — we work with your forwarder or introduce ours.
MOQ and pricing questions
How accurate are the published price bands?
Why is walking aid pricing higher than bath safety?
What is the lowest MOQ you accept?
Can I mix different models in one order?
What are the payment terms?
Are prices FOB or delivered?
Get an itemised quote in 24 hours
Send the model, quantity and destination country. You will get unit price, carton data, MOQ per SKU and lead time — not a range.